XiDRT™ Digital Urban Rail Transit Solution
TRANAVI Qiji® Train Autonomous Control System (TACS)
Urbalis® 888 / TRANAVI® CBTC System Solution
SmarTram® Intelligent Control System Solution
INTXIS(CTCS2+ATO)Train Control System Solution
Beidou Positioning Based Train Autonomous Control System (TACN)
Centralized Traffic Control System (FZk-CTC)
Train Dispatching Command System (TDCS)
Railway Integrated Dispatching System (RIDS)
Computer Interlocking System (iLOCK-II / iLOCK-IIE / iLOCK-IIT)
Computer Interlocking System (iLOCK / iLOCK-E)
Compute Interlocking System (VPI)
Days ago, a delegation of four people from the Sistema de Transporte Colectivo (STC), accompanied by relevant personnel from CRRC, visited CASCO for investigation and research, and had a discussion and exchange with CASCO’s technical experts in the field of urban rail transit.
STC delegation visits CASCO
CASCO introduced the company's development history and other information including product development, project implementation, market performance, quality and safety system to the STC delegation. Later, the two parties had an in-depth communication on the PCC reconstruction project of Mexico City Metro Lines 1-6 under cooperation. During the session, José Ramón, Director of Communication and Signaling Department of STC, fully recognized the excellent performance of the CASCO project team in the restoration work.
After the meeting, the delegation visited the " Shanghai Engineering Research Center of Driverless Train Control of Urban Guided Transport" built under the leadership of CASCO, observed the demonstration of the fully automatic operation system, listened to the introduction on the implementation of the company's key technologies in the industry, and highly praised CASCO's strength in the field of rail transit signaling.
Through this visit, the STC delegation gained a deeper understanding of CASCO and further strengthened their confidence in our completing the PCC reconstruction of the Mexico City Metro at an early date.
Some line dispatching workstations have been restored
At present, Line 1 has been delivered. CASCO is advancing the restoration of the remaining lines in an orderly manner and accelerating the full recovery of PCC to ensure the safe and efficient operation of the Mexico City Metro with CASCO's strength.
11F, Building 2, Shibei One Center, No. 21, Lane 1401, Jiangchang Road, Jing'an District, Shanghai
86 -21-5663 7080
041-35775(Railway)