Fully Automatic Operation System 2.0 for Smart Metro
TRANAVI Qiji® Train Autonomous Control System (TACS)
Urbalis® 888 Train Control System Solution
INTXIS(CTCS2+ATO)Train Control System Solution
Centralized Traffic Control System (FZk-CTC)
Train Dispatching Command System (TDCS)
Computer Interlocking System (iLOCK-II)
Computer Interlocking System (iLOCK)
Full Electronic Computer Interlocking System(iLOCK-E)
Compute Interlocking System (VPI)
Centralized Signaling Monitoring System(CSM-KA)
11F, Building 2, Shibei One Center, No. 21, Lane 1401, Jiangchang Road, Jing'an District, Shanghai
86 -21-5663 7080
041-35775(Railway)