XiDRT™ Digital Urban Rail Transit Solution
TRANAVI Qiji® Train Autonomous Control System (TACS)
Urbalis® 888 Train Control System Solution
TRANAVI® Train Control System Solution
SmarTram® Intelligent Control System Solution
INTXIS(CTCS2+ATO)Train Control System Solution
Beidou Positioning Based Train Autonomous Control System (TACN)
Centralized Traffic Control System (FZk-CTC)
Train Dispatching Command System (TDCS)
Railway Integrated Dispatching System (RIDS)
Computer Interlocking System (iLOCK-II / iLOCK-IIE / iLOCK-IIT)
Computer Interlocking System (iLOCK / iLOCK-E)
Compute Interlocking System (VPI)
On the afternoon of October 13th 2014, Zhou Zhiliang, President of China Railway Signal & Communication came to CASCO to visit and inspect, together with Vice President Yin Gang and Chen Hong and Deputy Director Wang Yin.
President Yang Haidong first gave a report about CASCO’s recent development and changes on behalf of the management, including the current organization structure, office layout, staff composition, operation condition and business status. Zhou Zhiliang spoke highly of CASCO’s achievements and recognized its progress in new technology and business development. He said that CASCO has accumulated a lot of useful experience in years of exploring, and believed that CASCO will grow to a new level with the support of CRSC and united efforts.
Lastly, President Zhou Zhiliang exchanged thoughts with present management and advanced his expectations about CASCO’s next development combined with its future plan. CASCO’s leaders said that his visit brought great encouragement to the staff and CASCO was full of confidence about fulfilling the objective of next stage and keeping a healthy development.
11F, Building 2, Shibei One Center, No. 21, Lane 1401, Jiangchang Road, Jing'an District, Shanghai
86 -21-5663 7080
041-35775(Railway)